|
|
Our design, fabrication, and construction management teams are located under one roof at our fabrication shop located one mile north of interstate 10 on highway 59 north. Listed below is a sample of equipment that we use in our fabrication and erection processes, and we are continually adding equipment to further increase our capacity and efficiency. In addition to the equipment listed below, our location provides us with full access to a wide range of highly qualified metal suppliers with vast inventories and out-sourcing ability for any secondary operations.
Please let us know if you need any additional information.
Shop Equipment
- 12' wide Hydraulic Shear
- 12' wide Hydraulic Brake (200 ton)
- 5' wide x 14' long CNC Plasma Table
- 5' wide Plate Roll
- 4' wide Sheet Roll
- 3' wide Sheet Roll
- (3) - 50 ton Iron Workers
- (2) - Angle Rolls
- 28" - 7 H.P. Drill Press
- 10' Hand Brake
- 4' Box Brake
- Beam Saw
- 12" Diameter Miter Cold Saw
- Aluminum Sheet Staplers
- GMAW (MIG) Welders
- GTAW (TIG) Welders
- SMAW (Stick) Welders
- Spot Welder
- Insulation Pin Welder
- Hand Plasmas
- Various Hand Notchers, Punches, and Shears
- Industrial Sand Blaster & Painting
- (2) Forklifts
- (3) Overhead Monorails
Field Equipment
- Mobile gas, diesel, and propane welders
- Duct jacks
- Electric duct hoist
- 185 cfm air compressor
- Duct and pipe testing apparatus
- Millwright and alignment tools.
|
|
|